MADC has proposed to setup a 200 MW (4 X 50 MW) coal based Power Plant within the
MIHANTM, SEZ, with a provision of 25MW Back up diesel generator sets
as startup power for the main unit and for emergency use. The Power Plant will cover
an area of about 60 Hectares.
The proposal is to have an uninterrupted quality power supply to the units in the
SEZ area at a competitive rate. The Power Plant will have permissible voltage fluctuation
5%. Because of the benefits of the SEZ, the project cost will go down by about 30%
and also the cost of power to the end user will be economical.
The power plant project is being established on Build, Own and Transfer (BOT) basis
on Public-Private Partnership (PPP) principle. A competent BOT player has been appointed
for establishing the power plant and to carry out the transmission and distribution
network in the MIHAN area. |