• Saturday, March 25, 2023,
  • Skip to main content |
  • Accessibility Options |
  • Screen Reader Access |
  • Sitemap |
  • A- A A+

ashokstambh
  • Home
  • About Us
    • Who We Are
    • Vision and Mission
    • Board of Directors
    • Task Force
    • Project Offices
    • Awards
    • Transparency International India (TII)
    • Corporate Citizenship
      • Rehabilitation & Resettlement
      • Corporate Social Responsibility
      • Vigil Mechanism Policy
      • General Meetings
    • Subsidiary
      • MIHAN India Limited
    • Associates
      • Shirdi Saibaba Airport Charitable Trust
      • Nagpur Mass Transport Company Pvt. Ltd.
      • Abhijeet MADC Nagpur Energy Pvt. Ltd.
  • Projects
    • MIHAN
    • Shirdi
    • Amravati
    • Solapur
    • Karad
    • Pune-Purandar
    • Dhule
    • Chandrapur
    • Phaltan
    • Power
      • Generation
      • Transmission
      • Distribution
  • Departments
    • Administration & HR
    • Land
    • Rehabilitation & Resettlement
    • Planning
    • Engineering, Airport development
    • Marketing & Estate
    • Finance & Accounts
    • Fire & Emergency Service
    • Company Secretary
    • Power
    • Legal
  • Tenders
    • Tender List
    • e-Tendering Live Link
  • Citizen Services
    • RTI Details
    • Grievances
    • Online Application for Services
    • MADC HEIGHT NOC
  • Investor Center
    • Investor Testimonials
    • Procedure
    • Feature and Facilities
    • Download Application
    • Clients
    • Policies
  • Media
    • News
    • Photo Gallery
    • Video Gallery
  • Contact Us
  • Login

 

 
 

MIHAN

About MIHAN  Infrastructure  Nagpur Airport  SEZ  NON SEZ 
brochure ppt-dwnld ppt-dwnld
  • Home ›   Projects ›   MIHAN ›   MIHAN Infrastructure
Print

Infrastructure

Mihan Infrastructure
1. Construction of Water Supply and sewerage System

Mihan Water Supply
Water Supply: (Total Requirement = 91 MLD)
  • Wadgaon Reservoir (at 34 km.) as source of water supply
  • Dual water supply system
  • Total 8 ESR’s and 5 GSR’s constructed in the area
  • Water Treatment Plant (20.64 MLD)
  • Network length – about 100 km.
 
Mihan Sewerage System
Sewerage System
  • Underground sewerage system of 38.8 km. length
  • Total 10 no of Sewage sump and Pump houses constructed
  • Sewage Treatment Plant (39 MLD)
  • Tertiary Treatment Plant (77 MLD)
 

2. Construction of Roads

Mihan  Construction of Roads
Total Length of roads - 54.6 km. consisting of
  • 6 - lane road - 03.50 km.(Rigid pavement).
  • 4 - lane road - 18.30 km.
  • 3 - lane road - 07.50 km.
  • 2 - lane road - 24.14 km.
  • 1 - lane road - 01.20 km.
 
3. Telephone Exchange Building
Mihan Telephone Exchange Building
Telecom Exchange Building consists of
  • Main exchange building
  • Transmission tower
  • 3 nos. of RSU
  • Trans-receiver station
  • Transformer room
  • Security room
  • DG yard etc.
 
4. Fire Station
Mihan Fire Station
  • Space for parking of 4 Fire Engines
  • Office , Parade Ground, Drill Tower, Repair Ramp, Petrol Storage Tank
  • Under Ground water Tank of 1 lac lit. Capacity
  • Officers’ and Firemen's’ Quarters
  • Fire tender Procured
 
5. Gate Complex
Mihan Gate Complex
Allied Works
  • Toilets : At 3 locations in SEZ area for visitors
  • Bus stop : Steel structure with benches at 6 locations
  • Kiosks : Concrete structures as outlets for selling various items at 5 locations
  • Interlocking Pavers : At footpaths for pedestrian walking
Gate plaza
  • SEZ area with 8 nos. toll booth, Weigh bridge platform and cabins
 
6. Construction of Storm Water Channel
Mihan Storm Water Channel
  • For collecting the storm water from MIHAN area & discharging into existing tanks viz. Dahegaon and Telhara
  • The total length of channel is 3.61 km.
  • Retaining wall along Dahegaon Tank
 
7. Construction of Boundary Wall
Mihan Boundary Wall
  • Boundary wall is a mandatory requirement as per SEZ act.
  • Length of wall 26.5 km. Height 1.6 m. + 0.6 m. (barbed wire fencing)
  • The boundary wall consists of concrete panels pre-stressed at factory and erected at site
 
8. Construction of 384 Tenements
Mihan  Construction of 384 Tenements
  • 4 storied, G+3 , 18 Buildings comprising of 1 BHK flats
  • Built up area of each tenement 31.3 Sq.m.
  • Facilities like internal road, landscaping, electrification, plumbing & sewerage, society office, Guard room etc.
 
9. Construction of Pre-Engineering Building
Mihan Pre-Engineering Building
  • Carpet area of warehouse – 4,00,000 Sq.ft.
  • Allotted to M/s Future Supply Chain Solutions Ltd. (FSCSL) on Leave and Licence basis for initial period of 14 years
  • The project consists of Pre-Engineered Building, utility blocks and other infrastructure works like roads, storm water drains, compound wall, other external development work etc.
 
10. Construction of Central Facility Building
Mihan  Central Facility Building
  • Building structure inspired from book holder & folding chair
  • G+ 3 structure with carpet area 174997 Sq.ft.
  • Car parking capacity about 120 at basement
  • MADC and DC’s office exist here
  • For energy saving long face oriented towards North
  • Building provides incubation space with fire protection & HVAC for units interested in SEZ
 
11. Power Distribution in Panjari
Mihan  Power Distribution
  • Tapping of power from 132 KV substation at Panjari by underground cable up to MADC substation near ROB to MIHAN
  • Total Connected Load – 3.343 MW
  • Further power distribution network up to threshold of consumer within rehab area
  • Handing over the entire operational network to MSETCL / MSEDCL.
 
12. Construction Of Extentended Link Taxiway in MIHAN,Nagpur
Mihan  Power Distribution
  • Total Project Cost :43.49Cr
  • Lenght of the Taxiway :1.4km
  • Total width of Taxiway :46m
 
13. Construction Of Extentended Link Taxiway in MIHAN,Nagpur
Mihan  Power Distribution
  • Total Project Cost :43.49Cr
  • Lenght of the Taxiway :1.4km
  • Total width of Taxiway :46m
 
14. Construction Of Extentended Link Taxiway in MIHAN,Nagpur
Mihan  Power Distribution
  • Total Project Cost :43.49Cr
  • Lenght of the Taxiway :1.4km
  • Total width of Taxiway :46m

 

 

  • GST Details|
  • Feedback|
  • Important Links|
  • Career|
  • Disclaimer|
  • Terms and Conditions|
  • Help
  • Regd. Office
  • 8th Floor, World Trade Centre, Cuffe Parade, Mumbai - 400 005.
  • Tel. No. : +91-22-49212121, 49212122
  • Fax No. : +91-22-22163814  E-mail:contact@madcindia.org
sba
  • Stay Connected   fb tw utube utube
  • Copyright © Maharashtra Airport Development Company Ltd.,
  • All rights reserved.
  • Page last updated on 13-02-2023   |    Visitors :: 1435484
Best viewed with IE 9 & above or Chrome, Mozilla Firefox.                                                                                Designed & Developed by ESDS Software Solution Pvt. Ltd